- Version
- Download 40
- File Size 246KB
- File Count 1
- Create Date Oct 02, 2026
- Last Updated Oct 02, 2026
Notice of Intended Application for a Licence for the Development of the proposed 20 MWAC Solar Photo Voltaic Power Plant with Battery Energy Storage Sytem in Naminya Village, Njeru Municipalty, Buikwe District
Attached Files
| File | Action |
|---|---|
| Notice of Intended Application for a Licence for theDevelopment of the proposed 20 MWAC Solar Photo Voltaic Power Plant with Bat | Download |