[featured_image]
  • Version
  • Download 40
  • File Size 246KB
  • File Count 1
  • Create Date Oct 02, 2026
  • Last Updated Oct 02, 2026

Notice of Intended Application for a Licence for the Development of the proposed 20 MWAC Solar Photo Voltaic Power Plant with Battery Energy Storage Sytem in Naminya Village, Njeru Municipalty, Buikwe District

Attached Files

FileAction
Notice of Intended Application for a Licence for theDevelopment of the proposed 20 MWAC Solar Photo Voltaic Power Plant with BatDownload
Skip to content