[featured_image]
  • Version
  • Download 5
  • File Size 514KB
  • File Count 1
  • Create Date Nov 14, 2024
  • Last Updated Nov 14, 2024

Policy Direction Relating to the 50MW Electromaxx Uganda Limited Thermal Power Plant at Tororo Under a Build, Own, Operate And Transfer Arrangement

Attached Files

FileAction
Policy Direction Relating to the 50MW Electromaxx Uganda Limited Thermal Power Plant at Tororo Under a Build, Own, Operate And Transfer Arrangement.pdfDownload

Leave a Reply

Your email address will not be published. Required fields are marked *

Skip to content