- Version
- Download 50
- File Size 514KB
- File Count 1
- Create Date Nov 14, 2024
- Last Updated Nov 14, 2024
Policy Direction Relating to the 50MW Electromaxx Uganda Limited Thermal Power Plant at Tororo Under a Build, Own, Operate And Transfer Arrangement
Attached Files
| File | Action |
|---|---|
| Policy Direction Relating to the 50MW Electromaxx Uganda Limited Thermal Power Plant at Tororo Under a Build, Own, Operate And Transfer Arrangement.pdf | Download |