Notices

Title Created Date Download
Notice of Intended Modification of Licence No. 093 Issued to Kinyara Sugar Limited
(65 Downloads)
2023-07-27 Download ( pdf, 101.33 KB )
Change of Electricity Distributor in the Northern Service Territory
(123 Downloads)
2023-06-30 Download ( pdf, 153.31 KB )
Notice of Intention to Modify License Number ERA/LIC/GEN/022/213 issued to Kametsi Energy Uganda Limited for the Generation and Sale of Electricity from the Proposed 3.9 MW Lirima Hydro Power Plant in Namisindwa District
(80 Downloads)
2023-06-26 Download ( pdf, 103.31 KB )
Testing Electricity Meters
(203 Downloads)
2023-06-22 Download ( pdf, 492.54 KB )
Notice to Show Cause Why License No. ERA/LIC/GEN/017/159 Should Not Be Revoked
(145 Downloads)
2023-05-15 Download ( pdf, 135.01 KB )
Notice to Show Cause Why Licence No. ERA/LIC/GEN/018/167 Should Not Be Revoked
(116 Downloads)
2023-05-15 Download ( pdf, 133.78 KB )
Application for a Generation and Sale of Electricity License for the Development of the proposed 30MWP Solar Photovoltaic Project in Kiraba Village, Okusijoni sub county in Adjumani District
(141 Downloads)
2023-04-17 Download ( pdf, 91.96 KB )
Application for a License for the Generation of Electricity for own use from the Tilenga Gas-Fired Power Plant with a Maximum Capacity of 80 MWe at the Tilenga Central Processing Facility in Buliisa District
(98 Downloads)
2023-04-13 Download ( pdf, 91.9 KB )
Notice of Proposed Transfer of Licence Exemption Number ERA/COE/20/89 Issued to Winch Lamwo SPV SMC Limited
(69 Downloads)
2023-04-04 Download ( pdf, 60.68 KB )
Notice of Intended Application for a License for the Development of the proposed 845 kWp Roof Mounted Solar Project at the Nile Breweries Limited Premises in Mbarara District
(83 Downloads)
2023-03-30 Download ( pdf, 76.54 KB )
Notice of Intended Application for a License for the Development of the proposed 10 MW Panyimur Geothermal Power Project in Pakwach District
(101 Downloads)
2023-03-27 Download ( pdf, 79.87 KB )
Notice of Intended Application for a License for the Development of the Proposed 13.8 MW Ngenge Hydropower Project on Rivers Emuchoni and Ngenge in Kween District
(157 Downloads)
2023-02-06 Download ( pdf, 549.35 KB )
Application for a Generation and Sale of Electricity License for the Development of the Proposed 4.8 MW Small Hydro Power Plant along River Rwimi In Bunyangabu District
(121 Downloads)
2023-02-02 Download ( pdf, 497.37 KB )
Notice of Intended Modification of Licence No. ERA/LIC/GEN/021/206 issued to Busitema University
(76 Downloads)
2023-01-05 Download ( pdf, 124.66 KB )
Notice of Application for a Generation and Sale of Electricity License for the Development of the Proposed 20 MWAC Solar PV Plant in Madi-Okollo District
(142 Downloads)
2022-12-13 Download ( pdf, 101.74 KB )
Notice of Intended Modification of Licence No. ERA/LIC/GEN/017/150 issued to Uganda Electricity Generation Company Limited in Respect of Karuma Hydro Power Project
(83 Downloads)
2022-12-13 Download ( pdf, 126.22 KB )
Notice of Public Hearing
(92 Downloads)
2022-12-07 Download ( pdf, 75.05 KB )
Notice of Applications for Annual Tariff Review for 2023
(96 Downloads)
2022-12-07 Download ( pdf, 62.5 KB )
Notice of Intended Modification of Licence Number ERA/LIC/GEN/021/208 Issued to Pago Uganda Limited
(108 Downloads)
2022-11-10 Download ( pdf, 152.9 KB )
Amendment of Regulatory Notice ERA 001/2020 - Grid Connected Solar
(180 Downloads)
2022-10-27 Download ( pdf, 84.74 KB )
Notice of Application for Renewal of Licences for Bulk Power Supply, High Voltage Transmission Grid, Power Export and Import and System Operator Issued to Uganda Electricity Transmission Company Limited
(114 Downloads)
2022-09-21 Download ( pdf, 63.54 KB )
Notice of Intended Modification of Licence Number 071 Issued to Kalangala Infrastructure Services Limited for the Generation, Distribution and Sale of Electricity In Kalangala District
(81 Downloads)
2022-07-18 Download ( pdf, 79.27 KB )
Notice of Intended Application for a Generation and Sale of Electricity License for the Development of the Proposed 10 MWac Solar PV Plant in Asinget Village, Kayoro Subcounty, Tororo District
(162 Downloads)
2022-06-25 Download ( pdf, 101.33 KB )
Application for a Certificate of Exemption for the Development of the Proposed 60 kWp Solar PV off Grid System in Nsambya Village, Kayonza Subcounty, Kayunga District by Volt-Terra Farm and Energy Solutions Limited
(122 Downloads)
2022-06-25 Download ( pdf, 81.31 KB )
Application for a Generation of Electricity License for the Development of the Proposed 8 MW Bagasse Cogeneration Power Plant in Buikwe District
(84 Downloads)
2022-06-25 Download ( pdf, 103.43 KB )

Contact us

Electricity Regulatory Authority 
New ERA House, Plot 5C-1 Third Street, Lugogo Industrial Area 
P.O.Box 10332, Kampala, Uganda
Telephone: +256 417 101800, +256 393-260166
Complaints Hotline: +256 200 506000 
Email: This email address is being protected from spambots. You need JavaScript enabled to view it.

Copyright © 2018 ERA - Electricity Regulatory Authority. All Rights Reserved

Go to top