Bagasse technology uses sugar cane residues to generate electricity. Whereas the Authority has so far licenced five bagasse Cogeneration power plants, with a total installed capacity of 96.2MW; only three dispatch power to the national grid. These include Kakira Sugar Works, Sugar and Allied Industries Limited (SAIL), and Kinyara Sugar Limited.

Click here for Detailed Statistics