Decisions & Notices
Application for a Certificate of Licence Exemption for the Development of the Proposed 135KW Solar PV Isolated Grid Systems
585KB 218 downloads Aug 25, 2025
Application for a Licence for the Development Of the Proposed 20 MW Olwiyo Solar Pv Project
579KB 329 downloads Aug 25, 2025
Notice of Intended Modification of Transmission Licence Number ERA/LIC/TX/025/236 issued to Amari Power Transmission SMC Limited
300 KB 730 downloads Aug 20, 2025
Application for a Licence for the development of the proposed Nchwera 4.7 MW Small Hydro Power Project
570KB 267 downloads Aug 19, 2025
Intended Modification of Transmission Licence Number ERA/LIC/TX/025/236
593KB 313 downloads Aug 14, 2025
Publication of the Business Continuity Management Guidelines
565KB 350 downloads Aug 14, 2025
Application for a Transmission Licence for the Construction and Operation of the Tilenga Transmission Line
580KB 327 downloads Aug 08, 2025
Public Notice - Application for a 220kV Transmission Line and a 33/132kV Clustering Solution in Eastern Uganda
597 KB 228 downloads Jul 28, 2025
Notice of Public Hearing - Nguvu Licence Application
595 KB 167 downloads Jul 28, 2025
Application for a 6.5 MW Hydropower Project in Madi-Okollo District
575 KB 568 downloads Jul 16, 2025
Notice of Amendment of the Electricity (Energy Rebate for Construction of Distribution Infrastructure) Guidelines, 2020
1 MB 187 downloads Jul 02, 2025
Notice Of Intended Application by Gamani Power Transmission Limited for an Independent Transmission Licence leading to the Development of the 132kV Mbale – Bulambuli – Kween Transmission Project in Eastern Uganda
139 KB 376 downloads Jul 02, 2025