Notice of Intention to Modify Licence No. 093 Issued to Kinyara Sugar Limited

1 MB 11 downloads Dec 15, 2025

Application for Renewal of Licence Number ERA/LIC/GEN/024/225 issued to PRO INDUSTRIES PTE. LIMITED

588KB 23 downloads Dec 08, 2025

Application for a Licence for the development of the Lower Achwa Hydropower Project

567KB 9 downloads Nov 28, 2025

Notice of Public Hearing - Sebei Hydro Uganda Limited for the development of the 9.5 MW Cheptui Hydropower Project

557KB 48 downloads Nov 19, 2025

Notice on Grid Absorption Capacity and Interim Licensing Measures for Grid Connected Solar Photovoltaic and Wind Power Projects

766 KB 95 downloads Oct 28, 2025

Application for a Licence for the development of the Lower Achwa Hydropower Project

567KB 13 downloads Sep 25, 2025

Notice of Public Hearing - GidroSila Power Company Limited for the development of the 17.8 MW Lower Achwa Hydropower Project

556KB 14 downloads Sep 23, 2025

Notice of Public Hearing - NOA Energy Services Uganda SMC Limited

565KB 10 downloads Sep 16, 2025

Notice Of Public Hearing - FRES Uganda Ltd

565KB 140 downloads Sep 16, 2025

Application for a licence for the development of the proposed 9.5 MW Cheptui Hydropower Project in Kapchorwa and Bulambuli Districts

569KB 15 downloads Sep 16, 2025

Application for an Independent Transmission Licence for the Development of the Proposed 132/11kV Lugazi, 132/33kV Akageti, 132/33kV Kasana Substations and the associated 132kV Transmission Lines

574KB 10 downloads Sep 04, 2025

Application for Renewal of Licences issued to Uganda Electricity Transmission Company Limited

592KB 12 downloads Sep 04, 2025
Skip to content