By June 2025, Uganda’s distribution network length stood at 79,898 km, translating into 42% growth over the last five years from  56,092 km in 2021. The low-voltage lines (LV) still dominates the distribution network with 47% of the overall distribution network to date. Streetlighting covered only 641 km, which is less than 1% of the overall distribution network length as of June 2025.  Download Detailed Statistics HereÂ