Notice of Intended Modification of Transmission Licence No. ERA/LIC/TX/025/236 issued to Amari Power Transmission SMC Limited

567KB 87 downloads Jan 13, 2026

Intended Application for a Licence for the development of the proposed 8.5 MW Angangura Hydropower Project along River Achwa in Pader District by Invictus Power (U) Limited

972KB 109 downloads Jan 13, 2026

Approved Providers for the Supply of Wooden Utility Poles in the Electricity Supply Industry in Uganda

160 KB 269 downloads Jan 09, 2026

Notice of Intended Application for a Licence for the development of the proposed 20 MWp Karamoja Solar PV Project with 30MWh BESS in Moroto District by Karamoja Solar Company Limited

232KB 300 downloads Jan 03, 2026

Schedule of End-User Electricity Tariffs to be Charged by Uganda Electricity Distribution Company Limited for the First Quarter (January to March) of the Year 2026

644KB 5643 downloads Dec 29, 2025

Notice of Intention to Modify Licence No. 093 Issued to Kinyara Sugar Limited

1 MB 222 downloads Dec 15, 2025

Application for Renewal of Licence Number ERA/LIC/GEN/024/225 issued to PRO INDUSTRIES PTE. LIMITED

588KB 369 downloads Dec 08, 2025

Application for a Licence for the development of the Lower Achwa Hydropower Project

567KB 147 downloads Nov 28, 2025

Notice of Public Hearing - Sebei Hydro Uganda Limited for the development of the 9.5 MW Cheptui Hydropower Project

557KB 331 downloads Nov 19, 2025

Notice on Grid Absorption Capacity and Interim Licensing Measures for Grid Connected Solar Photovoltaic and Wind Power Projects

766 KB 270 downloads Oct 28, 2025

Application for a Licence for the development of the Lower Achwa Hydropower Project

567KB 189 downloads Sep 25, 2025

Notice of Public Hearing - GidroSila Power Company Limited for the development of the 17.8 MW Lower Achwa Hydropower Project

556KB 281 downloads Sep 23, 2025
Skip to content